View Single Post
Old 08-07-2009, 02:49 PM   #6
shueardm
Senior Member
 
Join Date: May 2007
Location: South Australia
Posts: 3,504
Default

Quote:
Originally Posted by tomzudock View Post
Of course, I can do that, but exporting a 2 hour video to AVI requires 45-60 minutes. Remember, I'm doing a ton of these, and it is more about being as fast as possible.
Fair enough. I can export a fair bit quicker with my CPU's so it doesn't bother me much.
__________________
VIDEODESK AUSTRALIA http://videodesk.com.au
shueardm is offline   Reply With Quote