    I have more than one project on the same timeline. How do I export each project so I can reopen them as a seperate project

  • #2
    OK, guys, don't bother, I figured it out.......what I did, is open a new project, then opened the project with the three items, copied and pasted into the new one....did it for each project, and now i have all three seperated as different projects....and it was so easy ...well, sometimes it pays to experiment

    Comment


    • #3
      "Save as" a project for each of the projects on the timeline, using different names of course. Then open each of these new projects and delete the parts of the timeline you do not want. That way you have the original with all the pieces on the timeline and a named project for each. All will have the same resources.

      Ron Evans
      Ron Evans

      Threadripper 1920 stock clock 3.7, Gigabyte Designare X399 MB, 32G G.Skill 3200CL14, 500G M.2 NVME OS, 500G EVO 850 temp. 1T EVO 850 render, 16T Source, 2 x 1T NVME, MSI 1080Ti 11G , EVGA 850 G2, LG BLuray Burner, BM IP4K, WIN10 Pro, Shuttle Pro2

      ASUS PB328 monitor, BenQ BL2711U 4K preview monitor, EDIUS X, 9.5 WG, Vegas 18, Resolve Studio 18


      Cameras: GH5S, GH6, FDR-AX100, FDR-AX53, DJI OSMO Pocket, Atomos Ninja V x 2

      Comment

      Working...
      X