Hello to all
When I export video to DVD begins calculates the time remaining to export the DVD is 6 hours and after several minutes down to 4 hours and prepared to two hours and starts normally calculates the remaining term
Knowing that in the past did not give me this data was time to export to DVD shorter video knowing that the same time and the same data
Length is an hour and 45 minutes
Video 1920*1080 25P
The question is
Is it right to take all this time to export DVD
Is there any way to reduce the duration of export with the same quality
When I export video to DVD begins calculates the time remaining to export the DVD is 6 hours and after several minutes down to 4 hours and prepared to two hours and starts normally calculates the remaining term
Knowing that in the past did not give me this data was time to export to DVD shorter video knowing that the same time and the same data
Length is an hour and 45 minutes
Video 1920*1080 25P
The question is
Is it right to take all this time to export DVD
Is there any way to reduce the duration of export with the same quality
Comment