I have a timeline with 4 to 5 layers. I want be able to move a section to the right < downstream > in the project to make room for some new clips. I need ALL layers < synced > to stay locked and move at the same time. Can this be done by placing TL cursor BEFORE all the material that needs to move downstream and using a hot key?
Or... can I select a clip on the TL and have everything to the right of it move in sync when I drag that clip to the right? < shift-alt just moves selected layer >
I sometimes just "drag-select" everything to the right of the cursor< or clip >
and then drag, but I'm sure they is an easier way to move all layers downstream and keep sync realitive.
Thanks!!
Or... can I select a clip on the TL and have everything to the right of it move in sync when I drag that clip to the right? < shift-alt just moves selected layer >
I sometimes just "drag-select" everything to the right of the cursor< or clip >
and then drag, but I'm sure they is an easier way to move all layers downstream and keep sync realitive.
Thanks!!
Comment